Bagdad Wastewater Treatment Plant Upgrade

Project Owner:
Premier Homes Bagdad, LLC
Date:
January 2009
Location:
Bagdad, AZ



Bagdad WWTP  

Project Description

Currier constructed a new mechanical bar screen at the head works and removed the existing grinder/auger equipment, a new cast in place equalization facility and new mixers; thus giving plant operation a new peak flow of .35mgd and ability to manage the solids loading on the final clarifiers. Just upstream of the aeration basin, a new cast-in-place selector zone was added to attenuate influent flow variations, promote settling via the mixers and prepare biomass for the aeration basins. CCI changed out the existing surface aerators to improve the oxygen transfer efficiency along with instrument controlled based HMI equipment.