James M. Tripp Reservoir

Project Owner:
Metropolitan Domestic Water Improvement District
June 2007

James M Tripp

Project Description

CCI constructed a buried 5mgd post tension DYK concrete reservoir and control building with valve vault structures. The reservoir is at an elevation that will allow gravity flow to distribute the water in the system, thereby maintaining more stabilized pressure even during high demand periods.